GENTING SANYEN POWER SDN. BHD.
 
Genting Sanyen Power Sdn Bhd ("GSP") owns the 720 MW gas-fired combined cycle power plant known as the Genting Sanyen Kuala Langat Power Plant. The plant  is located at the Genting Sanyen Paper Mill Complex in Kuala Langat, Selangor.

In developing the Kuala Langat Power Plant, GSP attained the following distinctions in Malaysia:

  1. The first IPP to generate and supply power to TNB.
  2. The first and only thermal power plant in Malaysia to provide its own water supply.
  3. The first power plant in Malaysia that supply steam to another industry. Combined Co-generation Cycle.
  4. The first power plant in Malaysia that uses hybrid cooling towers.
  5. Being the first set-up in Malaysia that employs absorption chillers for air conditioning.
  6. Achieving a Malaysian record time of 9 months in constructing transmission lines for TNB that also includes the acquisition on the wayleave.
  7. The first combined cycle in Malaysia that employ the 3-3-1 block configuration. It also employs the 5-4-1 block configuration for whole plant.